construction site tractor

5 Common Violations observed by CloudCompli Users

In California, the Stormwater Multi-Application, Reporting and Tracking System (SMARTS) issue the Industrial Stormwater General Permit (IGP) and the Construction Stormwater General Permit (CGP) in accordance with the EPA’s National Discharge Elimination System Permits (NPDES). Both permits are designed to reduce pollution entering into stormwater runoff. Failure to obtain the required permit as well as unpermitted discharges are two obvious and direct violations, but other violation of state stormwater permits may be less obvious.